DATES TO BE ANNOUNCED SOON PROJECTS LISTED BELOW
*** Repair and reshape trails damaged by spring trail races and overuse issues***
*** Cut back over grown trails 15 and 17 leading in to event day***
***Recut entry ways in to some of the ravine crossings ***
*** Build/repair bridges and walkways in the system***
****In planning stages – We will be designing 3.5 miles of new single track that will remove the road section from the race making the entire 40 miles of the race trail. ****